// IMAGE_UNAVAILABLEPharma Plants Turn Scope 1 and 2 Data Audit-Ready1724[Omni Vision for Pharmaceutical Compliance]Pharma Plants Turn Scope 1 and 2 Data Audit-ReadyPharma plants can meet ESOS deadlines with sub-metered Scope 1 and 2 data for audit-ready SECR and CDP emissions reports each year.// September 9, 2026Open →
// IMAGE_UNAVAILABLETurnkey Energy Solutions for Manufacturing in 8-16 Weeks1723[Omni Vision for General Industry]Turnkey Energy Solutions for Manufacturing in 8-16 WeeksTurnkey manufacturing energy monitoring in 8-16 weeks links utilities to production for ISO 50001, ESOS and Scope 1-2 reporting.// September 9, 2026Open →
// IMAGE_UNAVAILABLEWhy Cooling Tower Energy Monitoring Tracks Cycles1722[Omni Vision for Chemical Industry]Why Cooling Tower Energy Monitoring Tracks CyclesCut cooling tower make-up water by up to 20% and blowdown by 50% by tracking cycles, conductivity, fan and pump energy.// September 9, 2026Open →
// IMAGE_UNAVAILABLEWhy Textile Mills Start Waste Heat Recovery with Stenters1721[Energy Audit for Textile]Why Textile Mills Start Waste Heat Recovery with StentersStenter heat recovery cut natural-gas use 13.6% in a wool mill. Learn why textile mills target exhaust for air preheating and hot water.// September 8, 2026Open →
// IMAGE_UNAVAILABLEWhy Variable Frequency Drive Load Profiles Beat Nameplates1720[Energy Audit for Manufacturing]Why Variable Frequency Drive Load Profiles Beat NameplatesLoad profiles reveal VSD retrofit savings in UK plants by tracking pump and fan speed, torque and runtime beyond motor nameplate kW ratings.// September 8, 2026Open →
// IMAGE_UNAVAILABLECarbon Reduction Roadmap for Food Manufacturing: Heat First1719[Energy Audit for Food & Beverage]Carbon Reduction Roadmap for Food Manufacturing: Heat FirstTwo-thirds of UK food and drink manufacturing energy is thermal heat. Build a heat-first roadmap to cut gas use and Scope 1 emissions.// September 8, 2026Open →