// IMAGE_UNAVAILABLEWhy Food Plants Monitor Six Utilities with Omni Vision1727[Omni Vision for Food & Beverage]Why Food Plants Monitor Six Utilities with Omni VisionMonitor electricity, gas, water, steam, compressed air and oil in real time to support HACCP, ISO 50001 audits and 15-25% savings with Omni Vision.// September 10, 2026Open →
// IMAGE_UNAVAILABLEPLC Energy Monitoring Integration Without PLC Write Access1726[Omni Vision for Environmental Monitoring]PLC Energy Monitoring Integration Without PLC Write AccessOPC-UA and Modbus TCP deliver sub-second PLC energy data without write access for cost control, carbon reporting and uptime.// September 10, 2026Open →
// IMAGE_UNAVAILABLESECR Carbon Reporting Compliance UK: The Two-Threshold Test1725[Omni Vision for Energy Consumption]SECR Carbon Reporting Compliance UK: The Two-Threshold TestSECR covers UK unquoted companies and LLPs meeting 2 of 3 size tests and using over 40,000 kWh. Check thresholds, exemptions and reporting duties.// September 10, 2026Open →
// IMAGE_UNAVAILABLEPharma Plants Turn Scope 1 and 2 Data Audit-Ready1724[Omni Vision for Pharmaceutical Compliance]Pharma Plants Turn Scope 1 and 2 Data Audit-ReadyPharma plants can meet ESOS deadlines with sub-metered Scope 1 and 2 data for audit-ready SECR and CDP emissions reports each year.// September 9, 2026Open →
// IMAGE_UNAVAILABLETurnkey Energy Solutions for Manufacturing in 8-16 Weeks1723[Omni Vision for General Industry]Turnkey Energy Solutions for Manufacturing in 8-16 WeeksTurnkey manufacturing energy monitoring in 8-16 weeks links utilities to production for ISO 50001, ESOS and Scope 1-2 reporting.// September 9, 2026Open →
// IMAGE_UNAVAILABLEWhy Cooling Tower Energy Monitoring Tracks Cycles1722[Omni Vision for Chemical Industry]Why Cooling Tower Energy Monitoring Tracks CyclesCut cooling tower make-up water by up to 20% and blowdown by 50% by tracking cycles, conductivity, fan and pump energy.// September 9, 2026Open →