LBI-125 125 kg general waste incinerator
The size for a remote site, a camp, a single hotel or a small depot: a shift clears roughly a tonne of residual waste. On this stream chamber volume decides more than the rating does — mixed refuse is bulky and light until it is compacted.
- Chamber
- 3.3 m³
- External dimensions
- 2880 × 1640 × 2040 mm
- Burners
- 3
- Loading
- Front (dual door)

- [LOAD]
- 125kg
- [BURN_RATE]
- 125kg/h
- [DUTY]
- Continuous
- [WEIGHT]
- 2.5t
LBI-125 In Full
- Chamber
- 3.3 m³
- External dimensions
- 2880 × 1640 × 2040 mm
- Burners
- 3
- Loading
- Front (dual door)
- Operating temperature
- 850–1,200°C
- Gas retention
- 2.0 s
- Ash residue
- 3–5%
- Heat-up time
- 30 min
- Fuel
- Natural gas / H₂ / diesel / LPG / bio
- Control panel
- IP6X rated PLC
- Refractory
- Coretex lining
- Origin
- United Kingdom
Rated Continuously
Throughput is a function of operating hours, not cycles.
The LBI-125 clears 125 kg/h for as long as it runs, so throughput is a function of operating hours rather than cycles. Sizing is straightforward: divide your weekly arisings by the hours you are prepared to run the unit and match that against the burn rate. Running fewer, longer burns is more fuel-efficient than repeatedly heating the refractory from cold.
Every unit reaches operating temperature within 30 minutes and holds flue gas above 850°C for two seconds in the secondary chamber — the Industrial Emissions Directive condition. Ash residue is 3–5% of input mass.
Specified for
- Municipal & council wasteBlack bin residual, street cleansing, litter and bulky waste, destroyed at the depot rather than hauled.
- Commercial & retail wasteBack-of-house residual from shops, centres, offices and estates once the recyclables are out.
- Hospitality & catering wasteHotel, restaurant and venue residual once food waste and recyclables are separately collected.
- International catering wasteCategory 1 catering waste from aircraft, ships and cross-border transport — destruction is mandatory.
- Remote sites, islands & campsIslands, camps, mines and off-grid sites where the collection round is absurdly long or does not exist.
- Construction & site wasteThe mixed residual left after site segregation — packaging, hoarding, welfare and general site waste.
Before you specify
Permit
Dry recyclables and food waste must be collected separately from residual waste under the recycling rules now in force for workplaces and households. A unit is specified for what remains after that, and the separation is what makes the remaining stream defensible rather than merely convenient.
Stack height
Comes out of a site-specific dispersion assessment, not a standard figure.
Full compliance requirementsRest Of The General waste Range
Same size, other waste types
LBI-125 Questions
Every answer below is derived from this model's published figures, not from a generic range sheet.
The LBI-125 is rated at 125 kg/h continuously, so throughput is a function of how many hours you run it rather than how many cycles you complete. Running it for an eight-hour shift clears roughly 1,000 kg. The 125 kg figure in the model name is the chamber charge, not a daily ceiling.
Continuous. The LBI-125 holds its rated 125 kg/h for as long as it is fed, so you can keep loading through a shift without waiting for a cycle to finish. Fewer, longer burns use less fuel than repeatedly bringing the refractory up from cold.
The LBI-125 is specified for municipal & council waste, commercial & retail waste, hospitality & catering waste, international catering waste, remote sites, islands & camps and construction & site waste. It reaches 850–1,200°C and holds flue gas above 850°C for two seconds in the secondary chamber, which is the Industrial Emissions Directive condition for these streams. Waste containing more than 1% halogenated organic content raises that secondary-chamber minimum to 1,100°C.
The LBI-125 measures 2880 × 1640 × 2040 mm (L × W × H) externally and weighs 2.5 t installed. You need clear working space around it for the front doors to swing and for ash removal, plus a stack whose height comes out of a site-specific dispersion assessment rather than a standard figure.
Yes. Running this unit needs an environmental permit from the Environment Agency in England and Wales, SEPA in Scotland or NIEA in Northern Ireland. The waste codes for general waste waste have to be named in the application, and a permit written for general waste does not silently cover them. We supply the technical data pack the permit application relies on.
The LBI-125 runs on natural gas, hydrogen, diesel, LPG or biofuel through 3 burners. Being hydrogen-ready matters if you expect to decarbonise the site later: the unit does not need replacing when the fuel supply changes.
Thirty minutes from cold to operating temperature. From there it runs between 850°C and 1,200°C, with a 2.0-second gas retention time in the secondary chamber and a Coretex refractory lining. Control is through an IP6X-rated PLC panel.
Ash residue is 3–5% of input mass, so roughly 95% of what you load stops being a disposal cost. On a 125 kg charge that leaves about 5 kg of ash to remove — the only fraction still attracting gate fees and Landfill Tax.
With an environmental permit, yes — and with the separate collection of dry recyclables and food waste done first, because that is now a legal requirement rather than good practice. What may be burned is the residual fraction that remains, with its waste codes named in the permit application.
When the round is long, unreliable or absent, or when the gate fee and Landfill Tax on the tonnage are large enough to carry the fuel, the operator time and the permit. Remote sites and islands are the clearest case because there is often no round at all; a city-centre retail park is an arithmetic question we are happy to do honestly.
No, and the distinction matters legally. Open burning of waste is generally unlawful for businesses and heavily restricted elsewhere. A permitted dual-chamber incinerator holds flue gas above 850°C for two seconds in a secondary chamber, which is the condition that destroys the organic fraction instead of dispersing it.
Is the LBI-125 the right size?
Send your waste streams and weekly arisings. We will confirm the model, the permit route for your site, and what the disposal-cost case looks like with fuel and capital included.





