AGBI-350 350 kg agricultural incinerator
A 350 kg top-loading batch unit for farm and rural sites. Top loading suits bulky, awkward loads — bedding, crop residue, forestry waste — that a front door would fight, and the burn runs unattended once the chamber is charged.
- Chamber
- 1250 × 610 × 630 mm
- External dimensions
- On request
- Burners
- 3
- Loading
- Top

- [LOAD]
- 350kg
- [BURN_RATE]
- <50kg/h
- [DUTY]
- Batch
- [WEIGHT]
- 2.3t
AGBI-350 In Full
- Chamber
- 1250 × 610 × 630 mm
- External dimensions
- On request
- Burners
- 3
- Loading
- Top
- Operating temperature
- 850–1,200°C
- Gas retention
- 2.0 s
- Ash residue
- 3–5%
- Heat-up time
- 30 min
- Fuel
- Natural gas / H₂ / diesel / LPG / bio
- Control panel
- IP6X rated PLC
- Refractory
- Coretex lining
- Origin
- United Kingdom
Rated Per Charge
The number in the model name is the load per charge, not an hourly rate.
The 350 kg in the model name is the load per charge, not an hourly rate. The unit burns at under 50 kg/h, so the practical planning unit is one charge a day rather than one hour. What counts is the complete cycle — first load to complete burn-down — because that is how declared throughput is measured, and it is confirmed against your own waste at commissioning. Size on what has to be cleared per cycle, and allow cool-down and ash removal before the next charge.
Every unit reaches operating temperature within 30 minutes and holds flue gas above 850°C for two seconds in the secondary chamber — the Industrial Emissions Directive condition. Ash residue is 3–5% of input mass.
Specified for
- Crop residue & plant wasteDiseased and notified crop material destroyed on the holding, at a condition a field fire cannot hold.
- Invasive species & vegetationKnotweed, hogweed and ragwort arisings destroyed on site — no controlled-waste movement, no viable rhizome left.
- Livestock bedding & litterBedding and litter from restricted or infected buildings, destroyed on site under ABP rules — not a route for routine muck-out.
- Forestry & timber wasteNotified timber, infested bark and OPM nests destroyed at the point of felling rather than moved under licence.
- Contaminated feed & grainCondemned grain and feed destroyed on the holding, with a record that it never re-entered the chain.
Before you specify
Permit
Required from the Environment Agency, SEPA or NIEA before the unit runs. An agricultural holding is not exempt because the waste is its own — a farm burning its own arisings in a permitted incinerator is still an operator, with the monitoring and record-keeping that comes with it.
Stack height
Comes out of a site-specific dispersion assessment, not a standard figure.
Full compliance requirementsRest Of The Agriculture Range
Same size, other waste types
AGBI-350 Questions
Every answer below is derived from this model's published figures, not from a generic range sheet.
The AGBI-350 takes 350 kg per charge and burns at under 50 kg/h, so the planning unit is one charge a day rather than an hourly figure. The complete cycle — first load to complete burn-down, taking in heat-up, cool-down and ash removal — runs to several hours, and the exact figure is confirmed against your own waste at commissioning. Size it on what has to be cleared per cycle.
Batch. The AGBI-350 is charged, run, and emptied as one cycle rather than fed continuously. The practical planning unit is one cycle per working day, with cool-down and ash removal before the next charge.
The AGBI-350 is specified for crop residue & plant waste, invasive species & vegetation, livestock bedding & litter, forestry & timber waste and contaminated feed & grain. It reaches 850–1,200°C and holds flue gas above 850°C for two seconds in the secondary chamber, which is the Industrial Emissions Directive condition for these streams.
The AGBI-350 weighs 2.3 t installed; external dimensions are confirmed at quotation stage. You need clear working space around it for top loading, which usually means overhead access or a loading platform, plus a stack whose height comes out of a site-specific dispersion assessment rather than a standard figure.
Yes. Running this unit needs an environmental permit from the Environment Agency in England and Wales, SEPA in Scotland or NIEA in Northern Ireland. The waste codes for agricultural waste have to be named in the application, and a permit written for general waste does not silently cover them. We supply the technical data pack the permit application relies on.
The AGBI-350 runs on natural gas, hydrogen, diesel, LPG or biofuel through 3 burners. Being hydrogen-ready matters if you expect to decarbonise the site later: the unit does not need replacing when the fuel supply changes.
Thirty minutes from cold to operating temperature. From there it runs between 850°C and 1,200°C, with a 2.0-second gas retention time in the secondary chamber and a Coretex refractory lining. Control is through an IP6X-rated PLC panel.
Ash residue is 3–5% of input mass, so roughly 95% of what you load stops being a disposal cost. On a 350 kg charge that leaves about 14 kg of ash to remove — the only fraction still attracting gate fees and Landfill Tax.
Yes. Running an incinerator needs an environmental permit from the Environment Agency, SEPA or NIEA, and that applies to a farm burning its own arisings as much as to a commercial operator. Where the charge contains animal by-products — manure-contaminated bedding, fallen stock, fish mortalities — the plant also needs APHA approval under the retained ABP Regulation.
Because an open fire cannot hold 850°C for two seconds, and that condition is what destroys pathogens, spores and viable rhizome instead of lofting them over the boundary. Open burning of crop residue is separately restricted by regulation, and where a plant health notice requires destruction, it will normally be satisfied by a permitted incinerator and not by a field fire.
Size on the volume you have to clear per cycle, not on an hourly rate. These are batch units burning at under 50 kg/h, so a full charge is a complete cycle of roughly eight to eleven hours across the three models, which take 350, 450 and 500 kg per charge. Divide your standing volume by the capacity to get the number of charges, and allow a day per charge.
Is the AGBI-350 the right size?
Send your waste streams and weekly arisings. We will confirm the model, the permit route for your site, and what the disposal-cost case looks like with fuel and capital included.