// IMAGE_UNAVAILABLEWhy Chemical Plants Need Energy Audits Under ESOS Phase 41715[Energy Audit for Chemical Processing]Why Chemical Plants Need Energy Audits Under ESOS Phase 4ESOS Phase 4 requires UK chemical plants to audit 95% of energy use by 2027, cutting waste across steam, heat, fuel and processes.// September 4, 2026Open →
// IMAGE_UNAVAILABLEWhy Pharmaceutical Thermal Modelling Depends on Batch Data1714[Heat & Mass Balance for Pharmaceutical]Why Pharmaceutical Thermal Modelling Depends on Batch DataBatch data captures transient heat loads for GMP-ready pharmaceutical thermal modelling, enabling defensible utility sizing and validation.// September 4, 2026Open →
// IMAGE_UNAVAILABLEHow HMB Models Expose Chemical Plant Bottlenecks1713[Heat & Mass Balance for Chemical Processing]How HMB Models Expose Chemical Plant BottlenecksHMB models expose chemical plant bottlenecks, testing utilities, relief systems and COMAH limits for safe throughput gains and stronger returns.// September 3, 2026Open →
// IMAGE_UNAVAILABLEPaper Machine Dryer Section Efficiency: Up to 4.6% Steam Cut1712[Heat & Mass Balance for Paper & Pulp]Paper Machine Dryer Section Efficiency: Up to 4.6% Steam CutReduce paper machine dryer steam use by up to 4.6% with cylinder and condensate modelling validated against industrial operating data results.// September 3, 2026Open →
// IMAGE_UNAVAILABLEHow Pinch Technology Cuts CHP Fuel Use in UK Plants1711[Pinch Analysis for Power Generation]How Pinch Technology Cuts CHP Fuel Use in UK PlantsCut CHP fuel use in UK plants with Pinch technology, matching heat to demand by temperature to reduce boiler firing and rejected heat.// September 3, 2026Open →
// IMAGE_UNAVAILABLEHeat Pumps in Pharmaceutical Manufacturing: 235 kWth1710[Pinch Analysis for Pharmaceutical]Heat Pumps in Pharmaceutical Manufacturing: 235 kWth235 kWth heat pump delivers 120°C for 7,200 annual hours in a UK pharma feasibility case, cutting boiler firing on defined utility loads.// September 2, 2026Open →