// IMAGE_UNAVAILABLEFood Processing Plant Energy Audits: Find Steam Losses1707[Pinch Analysis for Food & Beverage]Food Processing Plant Energy Audits: Find Steam LossesFood processing plant energy audits identify steam losses, cut boiler fuel waste and support ESOS Phase 4 compliance before 5 December 2027.// September 1, 2026Open →
// IMAGE_UNAVAILABLEHow Pinch Analysis Retrofitted a Crude Distillation HEN1706[Pinch Analysis for Chemical Processing]How Pinch Analysis Retrofitted a Crude Distillation HENPinch analysis retrofit of a crude distillation HEN delivered US$2 million in annual savings, boosting preheat recovery and cutting furnace duty.// September 1, 2026Open →
// IMAGE_UNAVAILABLEWhy Thermal Process Simulation Matters for ESOS Phase 41705[Industrial Energy Audit]Why Thermal Process Simulation Matters for ESOS Phase 4Thermal process simulation strengthens ESOS Phase 4 evidence by testing fuel, heat and utility savings before 2026 and 2027 deadlines.// September 1, 2026Open →
// IMAGE_UNAVAILABLEHeat Exchanger Network Optimisation: The ΔTmin Trade-Off1704[Pinch Analysis]Heat Exchanger Network Optimisation: The ΔTmin Trade-OffCut refinery heating fuel by 8%-25% with heat exchanger network optimisation. Balance ΔTmin, heat recovery, exchanger cost and emissions.// August 31, 2026Open →
// IMAGE_UNAVAILABLEEnergy Reduction Strategies for Bakeries: Oven Heat Losses1703[Heat & Mass Balance for Food & Beverage]Energy Reduction Strategies for Bakeries: Oven Heat LossesBakery oven energy use ranges from 0.110-2.0 kWh/kg. Measure exhaust, casing and idle heat losses to cut costs and protect bake quality.// August 31, 2026Open →
// IMAGE_UNAVAILABLEPinch Analysis Methodology: Two Routes to Heat Targets1702[Heat And Mass Balance]Pinch Analysis Methodology: Two Routes to Heat TargetsPinch analysis methodology compares Composite Curves and Problem Tables to set ΔTmin heat recovery, hot utility and cold utility targets.// August 31, 2026Open →